Ask Experts Questions for FREE Help !
Ask
    detroit novice's Avatar
    detroit novice Posts: 1, Reputation: 1
    New Member
     
    #1

    Oct 4, 2005, 06:35 PM
    New 2nd Floor 1/2 bath
    I own a 1942 bungalow with a single 1st floor bathroom. I would like to add a 1/2 bath to the 2nd floor. The vent from the basement/1st floor passes through the upstairs bedroom. The stack is behind a plaster 'bump out' on an exterior wall that is about 16" wide and 3" deep.

    Whether I do the work myself or hire a plumber, I would just like to get a feel for what this would take. Obviously I will need to run copper from the basement to the 2nd floor. I am assuming I can run both lines up the same path as the vent, space permitting. The 1st floor bathroom is directly below where I would like the bathroom on the 2nd floor.

    The drainage and venting is where I become confused. I have been reading other messages about how to avoid running a second, dedicated vent through the roof just for the 2nd floor bath, but it is still unclear to me. Do I run a second vent from above the 1st floor sewer connection to a spot on the existing vent above the 2nd floor sewer connection? Is this called 'reventing'?

    Like I said, I'm just trying to get a feel for the size of the job. I will obviously need to study up on plumbing and code, if and when I decide to take on this project. Hiring a plumber is probably as wiser idea.

    Thanks!
    atticguy's Avatar
    atticguy Posts: 36, Reputation: 1
    Junior Member
     
    #2

    Oct 5, 2005, 06:27 AM
    I did the same thing you are now contemplating. In laymans terms: I opened up the water wall in my downstairs bath. Where the vents (ALL of them) tied into the main stack, I cut them off and extended them into my attic and tied them back into the main stack. (you must tie them back in 6" above your sink's rim). Right below where the vents tied into the stack on the first floor, I cut off the cast iron stack all the way to the roof and converted to PVC. Tie in all your 2nd floor units as normal, making sure they drain/vent as code permits. This is a big project and I have some tips for you.

    1) plumb in the drain/vent first. They receive precedent because drains are powered by gravity. i.e. they have a limited # of places they can go. Then plumb supplies.

    2) listen to any and everything that labman (TOM) has to say. His word is gospel. To defy or reject anything he says is just plain dumb and your project will likely have negative outcomes.

    3) refer to #2

    Good luck

    Louie
    speedball1's Avatar
    speedball1 Posts: 29,301, Reputation: 1939
    Eternal Plumber
     
    #3

    Oct 5, 2005, 10:29 AM
    Thanks Louie,( Attic Guy) for those nice words in (2) but I'm not Labman I'm speedball1 but Labman thanks you also.

    If the vent from the first floor bath is at least three inches then you may cut in a sanitary tee and discharge the second floor bathroom into that. If not you'll have to run a 3" drain up to pick up the second floor bathroom group. You'll vent the group off the lavatory and tie back,(revent) to the main vent in the attic. However, that's assuming the first floor vent's three inches or over. If it is you're home free on the second floor drain and vent. What you can not do is discharge the second floor bathroom group past the firdst floor without first giving it a proper vent. You must disconnect the first floor lavatory vent from the 3" line that's now the second floor drain and run a 2" vent up past the second floor bathroom group and revent back in the attic to the main vent going out the roof.
    If this sounds complicated and a lot of hassle, that's because it is. Installing a bathroom group over another bath group's major surgery and unless you have plumbing skills best to contract the job out. I didn't mention the water pipe because that's a breeze compared to the drains and vents. Good luck, Tom
    atticguy's Avatar
    atticguy Posts: 36, Reputation: 1
    Junior Member
     
    #4

    Oct 5, 2005, 11:52 AM
    Sorry, TOM aka speedball. I guess I see so much of you two around here - I got mixed up.

    Anywho- LISTEN TO SPEEDBALL about plumbing, he's the man.

    Also, listen to labman - he's got his head on straight and knows a lot about a lot. Plus he's a chemist, so I have to give him a tilt of the hat. (I'm a chemist also)


    Louie (atticguy)

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Converting half bath to full bath [ 9 Answers ]

My question refers to a half bath we are in the planning stages of converting to a full bath in the basement. Currently our basement has a half bath with toilet and sink on one half of the basement. There is then a shower on the other side of the basement with the washer and dryer, about 30 feet...

Cutting cement for plumbing 3/4 bath to full bath [ 3 Answers ]

We are currently in the middle of changing our basement 3/4 bath into a full bath. The bathroom is 5.5' by 13.5'. We want to put the sink where the shower was and put a tub/shower where the sink was. (because the space where the shower was is too small for a tub). The old sink drain is centered 4...

Revent 1st floor fixtures when adding attic 1/2 bath? [ 12 Answers ]

Hello, thanks ahead of time for any help you can offer. My house is a cape cod. I'm converting the attic into master suite with half bath. (yes, I had it checked, I have egress/access/structural support). My question deals with reventing. It is my understanding that all current vents have to be...

1ST Floor Bath addition [ 5 Answers ]

I am hoping someone can offer advice. I currently live in the NE in a 1/2 double home that is 80+ yrs old. Approx. 25 yrs ago an additional room was added to rear of first floor (nothing is above this room). This room currently has a large sink. I would like to/in process of gutting the room to...

Raising a floor drain in concrete floor [ 2 Answers ]

I have an old concrete floor with a newer pvc type drain. The floor slopes about 1.5" over 2' around the drain so I would like to raise the drain in order to level the floor to install ceramic tiles. I'm still going to ensure the floor slopes toward the drain just enough. I figure I need to...


View more questions Search