Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Exterior Home Improvement   »   Cantilever floor joists

 
Question Tools Search this Question Display Modes
Question
 
 
#1  
Old Oct 12, 2006, 09:41 PM
renolenny
New Member
renolenny is offline
 
Join Date: Oct 2006
Posts: 12
renolenny See this member's comment history on his/her Profile page.
Cantilever floor joists

I wish to replace the flat picture window in our house with a bow window. I want to extend the floor by sistering the existing joists and extending them out 24 inches from the wall. There is one catch though, the existing joists are imbedded in the concrete wall of the foundation. Any ideas out there???

Reply With Quote
 
     

Answers
 
 
Old Oct 13, 2006, 04:27 AM   #2  
RickJ
Administrator
RickJ is offline
 
RickJ's Avatar
 
Join Date: Aug 2005
Location: Cave 4, Qumran
Posts: 6,889
RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.
I can't picture what you mean by extending the floor. Do you mean extending it only below where the window will go? You can certainly add on from the exterior but what about above the window? You'll still have to bring the extended part back to the house. Can you clarify?
  Reply With Quote
 
     
 
 
Old Oct 13, 2006, 07:12 PM   #3  
renolenny
New Member
renolenny is offline
 
Join Date: Oct 2006
Posts: 12
renolenny See this member's comment history on his/her Profile page.
Quote:
Originally Posted by RickJ
I can't picture what you mean by extending the floor. Do you mean extending it only below where the window will go? You can certainly add on from the exterior but what about above the window? You'll still have to bring the extended part back to the house. Can you clarify?
Rick in reply to your query: I intend to have the bow window constructed so it will extend out from the existing wall just enough to keep it behind the existing facia. there will be framing below the window around 12-14 inches high, upon which the window will rest. Above the window will be framed in , sealed and insulated; to finish the exterior wall right up to and attaching to the existing soffit. Something I failed to mention earlier is that I have a crawl space below the living room floor so access to the existing floor joists is OK although a bit cramped about 40 inches head room. I don"t look forward to chipping out the concrete that surrounds the esisting floor joists, I need to extend 7 of these . The concrete appears to be the full thickness of the basement wall.Regards Len
  Reply With Quote
 
     
 
 
Old Oct 19, 2006, 05:56 PM   #4  
jdesotle
New Member
jdesotle is offline
 
Join Date: Oct 2006
Posts: 4
jdesotle See this member's comment history on his/her Profile page.
I'm not real clear on what you are referring to when you say the joists are embedded in concrete. If the existing joists or "box" beam is not visible from the outside of the house and you need to break through the foundation to expose them, then you may want to consider attaching a ledger board onto the house and run your two foot joists to a girder that sits on two footings. This will prevent you from having to hammer apart your foundation. You can connect your ledger board to the concrete by drilling holes with a hammer drill and inserting sleeve anchors or wedge anchors, you can find them at any hardware store.
  Reply With Quote
 
     
 
 
Old Oct 20, 2006, 12:14 AM   #5  
renolenny
New Member
renolenny is offline
 
Join Date: Oct 2006
Posts: 12
renolenny See this member's comment history on his/her Profile page.
It was very common in this part of Canada back in the 60's to fill the space between the floor joists where they sit on the foundation, with concrete, before the subfloor was installed. For the life of me I do not know the reasoning, but it sure causes grief, especially if you want to run a pipe for a vacu-flow exhaust, basement dryer, hose bib, etc.Common sense says that the sill ledger would keep the joists from twisting at their ends.
  Reply With Quote
 
     
 
 
Old Oct 20, 2006, 03:16 AM   #6  
RickJ
Administrator
RickJ is offline
 
RickJ's Avatar
 
Join Date: Aug 2005
Location: Cave 4, Qumran
Posts: 6,889
RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.RickJ See this member's comment history on his/her Profile page.
This design takes me out of the loop for being able to help. I just can't picture it well enough to say what I'd do...but I will move this question to Exterior Home Improvement, to see if we can get some more eyes on it.
  Reply With Quote
 
     
 
 
Old Nov 6, 2006, 04:21 PM   #7  
renolenny
New Member
renolenny is offline
 
Join Date: Oct 2006
Posts: 12
renolenny See this member's comment history on his/her Profile page.
Greetings forum users: Here is an update on my floor joist issue. I am presently installing hardwood floor in the house. There used to be carpet in the living room where this window is located. In order to bring that floor up to the level of the rest of the rooms I will need to add a layer of 3/4 inch plywood to the existing sub-floor. I stopped laying hardwood about 16 inches from the window, I used my skil saw and removed a strip of sub floor 6 inches wide by 8 ft long. This exposed the ends of the floor joi9sts where they sit on the foundation. I now had good access to the concrete poured between each joist. I rented a hammer drill and chipped out enough along one side of each joist to allow me to sister and cantlilever all 7 joists. In the spring, I will remove the first row of siding to expose the rim joist, remove it and extend the joists to support the bow window and floor extension. I am re- installing the pieces removed from the sub=floor and will then add the second layer of plywood secured with PL400 and deck screws. I will not install the last strip of flooring to allow access to the existing wall when it becomes time to remove it.
  Reply With Quote
 
     


Question Tools Search this Question
Search this Question:

Advanced Search
Display Modes

 
Similar Sponsors

Similar Questions
Question Asker Topic Answers Last Post
cantilever system for fluorescent lights standouglas Construction 1 Sep 29, 2006 07:49 PM
Running Drain pipes thru 2 x 8 floor joists. rtravis Plumbing 1 Aug 19, 2006 05:26 AM
Refinishing floor treborc Interior Home Improvement 1 May 9, 2006 02:12 AM
New second floor plumbing kph8720 Plumbing 4 May 17, 2005 08:39 AM
raising a floor drain in concrete floor notuhplumber Plumbing 2 Apr 7, 2005 09:14 PM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 08:15 PM.

Content Relevant URLs by vBSEO 3.0.0 RC6 © 2006, Crawlability, Inc.