how can i calculate pump capacity?

Asked Mar 12, 2012, 09:13 AM — 1 Answer
how can we calculate water pump capacity and pipe diameter for 20 story residential building , over head tank capcity is 50000 liter if pump operating hour 5

1 Answer
Faizan Mkd's Avatar
Faizan Mkd Posts: 3, Reputation: 1
New Member
 
#2

Mar 8, 2013, 01:59 AM
you must at least have pipe diameter for calculation. Let some diameter of pipe you want, see its allowable velocity for the pipe material and diameter & then calculate its flow.
Helpful

Not your question? Ask your question View similar questions

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search

Add your answer here.

Remove Text Formatting

Undo
Redo
 
Decrease Size
Increase Size
Bold
Italic
Underline
Align Left
Align Center
Align Right
Ordered List
Unordered List
Decrease Indent
Increase Indent
Insert Email Link
Wrap [QUOTE] tags around selected text
Wrap [CODE] tags around selected text
Wrap [HTML] tags around selected text
Wrap [PHP] tags around selected text
Wrap [YOUTUBE] tags around selected text
Notification Type:



Check out some similar questions!

How to calculate crane capacity [ 3 Answers ]

Hi, I would to know about : - calculate crane capacity in 20, 45 degree - calculate crane boom lifting capacity

How I calculate that what capacity modem I needed [ 0 Answers ]

I want to purchase a modem. But how I calculate that what capacity (1GB, 2GB such as) will be needed.

How to calculate lifting capacity. [ 0 Answers ]

I am looking to purchase a crane for our company. We have a type of product that weighs approx 40 tons and is generally lifted in various setting in the oilfield. What I want to know is how to determine what capacity of crane would be needed to safely handle the load. A typical lift would consist...

How to calculate braking capacity [ 0 Answers ]

How to calculate braking capacity

How do I calculate the capacity variance... [ 1 Answers ]

Variable overheads $257,600 Fixed overheads $123,200 Estimated machine hours 22,400 Actual overheads $360,500 actual machine hours 20,970 This is all I've been given to work with?


View more Engineering questions Search