Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Electrical & Lighting   »   Main Panel to Sub Panel

 
Thread Tools Display Modes
Question
 
 
#1  
Old May 1, 2007, 07:55 AM
BSelff
New Member
BSelff is offline
 
Join Date: May 2007
Posts: 9
BSelff See this member's comment history on his/her Profile page.
Main Panel to Sub Panel

I currently have a CH MBE4040B200BTS Meter main panel on my pump house drawing only power to run booster and well pumps, here is what I wish to do:
Add a CH BRS225 (feed thru) to a CH BR4040B200 Main Breaker sub panel for my shop. Both panels are only 200 amp service, I will not be running more than the compressor ans 1 other item at a time (aside from lighting). Does anyone forsee a problem with my thoughts?? I have a PDF file of my shop elec drawing and the hookup.

Thanks,
Bob

Attached Images
File Type: pdf Pump To Shop Elect.pdf (11.8 KB, 51 views)
File Type: pdf Shop Electrical layout.pdf (40.2 KB, 76 views)
Reply With Quote
 
     

Answers
 
 
Old May 1, 2007, 10:35 AM   #2  
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,570
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
I see no problem with it, looks like a good use of the 200 amp service now just for the pump.

You may want to consider using #4/0 Aluminum instead of the #2/0 copper, one to save a ton of cash, but more importantly reduce voltage drop. If you have a 100 amp load in the shop, the #2/0 will produce a 10 volt drop, which is more than the recommended 3%. If you use #4/0 Al for the same load and distance, the volts dropped will be about 3.5 volts, well below the 3%.

The feeder to the subpanel should be 4 wire, and at least one ground rod will be needed to ground the equipment ground at the subpanel. Keep the neutral and equipment ground separated at the subpanel.

I hope this helps, do not hestitate to get back with any other comments or questions.
  Reply With Quote
 
     
 
 
Old May 1, 2007, 10:41 AM   #3  
New Member
BSelff is offline
 
Join Date: May 2007
Posts: 9
BSelff See this member's comment history on his/her Profile page.
I have had them install a Eufer (ground bar attached to the rebar in the slab) in the workshop for grounding it separately.

Bob
  Reply With Quote
 
     


Thread Tools
Display Modes

 
Similar Sponsors

Similar Threads
Question Asker Forum Answers Last Post
Main Circuit Panel to Branch Panel? cmcclenny Electrical & Lighting 1 Apr 2, 2007 02:29 PM
Main panel as subpanel dwright30 Electrical & Lighting 2 Feb 19, 2007 04:37 PM
Main Services Panel DIETGENT Electrical & Lighting 1 Feb 1, 2007 12:49 AM
Difference between Main Lug and Main Breaker Panel Hoot01 Electrical & Lighting 5 Jan 22, 2007 01:46 AM
Sub Panel with a main in Position 2,4, 6 mike721 Electrical & Lighting 2 May 5, 2006 06:34 AM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 01:02 AM.