Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Electrical & Lighting   »   SEU/Load panel

 
Question Tools Search this Question Display Modes
Question
 
 
#1  
Old Jun 23, 2007, 03:01 PM
shader's Avatar
shader
Junior Member
shader is offline
 
Join Date: Nov 2005
Posts: 150
shader See this member's comment history on his/her Profile page.
SEU/Load panel

I’ve seen questions here similar to mine, but I just need to be sure about a few things before I proceed. I have to move the main load panel appx. four feet from its present location and I will be replacing the junk Federal Pacific (FP) unit with a new main breaker panel. The FP is inside, and connected to the meter via a short piece of rigid. Due to the way the FP is mounted flush to the framing and the way the ridged is configured, along with limited clearance for the drywall studs, running conduit from the meter to the new panel would be a nightmare, if not impossible to clearance issues. The current system is grounded via the panel connected to the meter box via the ridged. The meter box is then connected to the ground rod. Questions: 1- Can SEU be used from the meter to the panel as long as the SEU is sheathed and behind the wall? 2- Does the exposed (not behind the wall) short section of SEU into the panel have to be in conduit? 3- How would the system be grounded? Connect the SEU ground to the ground in the meter box?

Reply With Quote
 
     

Answers
 
 
Old Jun 23, 2007, 03:57 PM   #2  
tkrussell
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,555
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
SEU can be exposed , but will need to be protected if can be subjected to physical damage. The more it is protected the better.

Since your only going to have about 4-6 feet of SEU cable from the meter to the panel, the main panel can contain the Main Breaker, and the grounding can be done either at the panel or the meter.
  Reply With Quote
 
     
 
 
Old Jun 24, 2007, 04:56 AM   #3  
shader
Junior Member
shader is offline
 
shader's Avatar
 
Join Date: Nov 2005
Posts: 150
shader See this member's comment history on his/her Profile page.
Quick follow up-forgot important item. What size wire to be used for a 100 amp panel? All the SEU I've seen is aluminum, ANy preference of aluminum vs. copper for SEU, if it is even available in copper?
  Reply With Quote
 
     
 
 
Old Jun 24, 2007, 05:19 AM   #4  
tkrussell
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,555
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
For a residential 100 amp feeder, either #4 copper or #2 AL. I have not seen copper SEU cable for years, mostly because I don't do much residential, and I get mostly cheap customers. How I wish I had someone say "money is no object"!

Copper SEU cable is available, only from electrical distributors, and probably only special order. Be careful, any distributor may be subjected to a minimum order,if you want a small amount, the distributor will only sell you the entire amount .

See: SEU

Aluminum SE cable is much more common, just check to be sure Al is allowed in your area. The thing to be careful with Al wire is the connections, follow the manufacturers instructions, which is to wire brush the exposed metal, use anti- oxidant compound, and torque the mechanical connections to specifications.
  Reply With Quote
 
     
 
 
Old Jun 24, 2007, 02:01 PM   #5  
Washington1
Electrical & Lighting Expert
Washington1 is online now
 
Join Date: Jun 2007
Posts: 627
Washington1 See this member's comment history on his/her Profile page.
Quote:
the grounding can be done either at the panel or the meter.
Clarify?
  Reply With Quote
 
     
 
 
Old Jun 25, 2007, 01:39 AM   #6  
tkrussell
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,555
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
Sure, the connection of the grounding electrode system to the grounded conductor shall only be on the line side the the main service disconnecting means.

This connection may be at any one or more accessible locations, which is at the panel that contains the main breaker, the meter, and/or at the transformer.

So, consider a real situation that has a ground mounted transformer, a meter trim only (no disconnect in the meter), and a panel with the main breaker. You can actually drive 3 ground rods, one at each location.

Most meter trims, can, sockets, come with a #6 lug on the solid neutral bar , just for the purpose of allowing the connection of a grounding electrode. Typically, the utility transformer is pole mounted, the utility always grounds their poles/transformers, leaving the meter and panel as accessible locations for installers.

Grounding the neutral before the main switch is intended to create and/or insure the grounded conductor.
  Reply With Quote
 
     
 
 
Old Jun 25, 2007, 07:18 AM   #7  
Washington1
Electrical & Lighting Expert
Washington1 is online now
 
Join Date: Jun 2007
Posts: 627
Washington1 See this member's comment history on his/her Profile page.
Quote:
This connection may be at any one or more accessible locations, which is at the panel that contains the main breaker, the meter, and/or at the transformer
.

It depends on the jurisdiction. This is why I ask for clarification. Not all areas will accept the Grounding connection in the meter can--rendering it non-accessible.
  Reply With Quote
 
     
 
 
Old Jun 25, 2007, 07:21 AM   #8  
tkrussell
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,555
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
Correct, even thou it is allowed by the National Code, that is why my signature states to always check with local codes.
  Reply With Quote
 
     
 
 
Old Jun 25, 2007, 07:31 AM   #9  
Washington1
Electrical & Lighting Expert
Washington1 is online now
 
Join Date: Jun 2007
Posts: 627
Washington1 See this member's comment history on his/her Profile page.
Got it!

A protection clause!! <Joke>
  Reply With Quote
 
     
 
 
Old Jun 25, 2007, 11:00 AM   #10  
tkrussell
Electrical & Lighting Expert
tkrussell is offline
 
Join Date: Jan 2005
Posts: 4,555
tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.tkrussell See this member's comment history on his/her Profile page.
I need something to rely on, I get a bit exhausted saying it over and over.

Got to be a little bit of attorney in this business, I am sure you know that, probably learned the hard way like I did.
  Reply With Quote
 
     


Question Tools Search this Question
Search this Question:

Advanced Search
Display Modes

 
Similar Sponsors

Similar Questions
Question Asker Topic Answers Last Post
Load Panel Access shader Electrical & Lighting 2 Jun 25, 2007 07:52 AM
subpanel/SEU/conduit shader Electrical & Lighting 1 Apr 13, 2007 10:28 AM
Main Circuit Panel to Branch Panel? cmcclenny Electrical & Lighting 1 Apr 2, 2007 02:29 PM
Kenmore Elite Dryer Toe panel - how to get panel OFF! debsherlrn Appliances 3 Mar 24, 2007 09:49 PM
Load panel capacity 200 amp doug196 Electrical & Lighting 1 Mar 4, 2007 07:50 AM




Copyright ©2003 - 2007, Ask Me Help Desk.
All times are GMT -8. The time now is 11:50 AM.

Content Relevant URLs by vBSEO 3.0.0 RC6 © 2006, Crawlability, Inc.