Ask Experts Questions for FREE Help!
  Advanced
Register  |  Log in  
   Ask    
 Answer  
  Help  

Ask QuestionsprogressAnswer QuestionsprogressBuild ReputationprogressBecome an Expert
 
Free Answers in 3 Easy Steps

Register Now
3 Steps

At Ask Me Help Desk you can ask questions in any topic and have them answered for free by our experts. To ask questions or participate in answering them you must register for a free account. By registering you will be able to:
  • Get free answers from experts in any of our 300+ topics.
  • Accept money for answers that you provide.
  • Communicate privately with other members (PM).
  • See fewer ads.

Home > Home & Garden > Construction   »   How do I raise a beam to install?

 
Question Tools Search this Question Display Modes
Question
 
 
#1  
Old Jun 7, 2007, 09:51 AM
affpro1234
New Member
affpro1234 is offline
 
Join Date: Jun 2007
Posts: 3
affpro1234 See this member's comment history on his/her Profile page.
How do I raise a beam to install?

I have 2 beams that I constructed out of 3x10s (three thick and spanning 23 feet). I am using these to support my springy floor. The house is a 1970's backsplit and the space they are in is a 4 foot high crawl space with a cement floor.

How do I raise these up to place the support posts under?
I have thought of 2 ways, but need some one to give me the safest way to do this by myself.
1. rent a large car jack and raise it that way.
2. some kind of pully system.

Please help, as I need to get these up before I can start tiling my entryway and kitchen.

Reply With Quote
 
     

Answers
 
 
Old Jun 7, 2007, 11:11 AM   #2  
ballengerb1
Home Repair & Remodeling Expert
ballengerb1 is offline
 
Join Date: Dec 2006
Location: Wheaton, Illinois, USA
Posts: 8,613
ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.ballengerb1 See this member's comment history on his/her Profile page.
Definitely no on the pulley idea followed with a close second no on the car jack. You need something along the lines of a 20 ton bottle jack and plenty of support spread out on the floor to prevent cracking. "2 beams that I constructed out of 3x10s (three thick and spanning 23 feet" did you have an engineer or architect give you the load requirements? First off I have never seen a kiln dried 3x10 in 50 years so maybe we're not using the correct terms. If you have a cement crawl space you'd be better off and safe by creating several smaller points to carry the load. You can buy adjustable metal columns for this purpose. Safer, better, cheaper than trying what you have in mind.
  Reply With Quote
 
     
 
 
Old Jun 8, 2007, 07:41 PM   #3  
glavine
Senior Member
glavine is offline
 
glavine's Avatar
 
Join Date: May 2007
Location: WINSTON SALEM NC
Posts: 895
glavine See this member's comment history on his/her Profile page.
We Just Done A Job Like This, Except We Didnt Have A Concrete From, So Your In Good Shape And Actually This Job Shouldnt Take All That Long, Id Say 4 Hours Tops If You Have 2 People. And You Do Need That

First Off Buy You A 4 X 6 X What Ever You Can Handle Comfortably
Like Ballanger Said Use Some Metal Post Jacks. These Are Adjustable .
What Id Do Is Get 3 10'ers And Put One Up At A Time , Both Of You Should Be Able To Hold The Beam While You Getting The Post Set, My Advise Is Go Ahead Get The Post Out And Set It At The Right Height Where There Is Little Adjustmetn To Do, After You Install The Beam And Have The Post Under It You Need To Go Back And Fasten The Beam With 3" Screws To The Joist And Then Fasten The Post To The Beam With Some Screws Also.

If There Is A Sag In The Floor You Will Need The 20ton Jack To Temp Hold The Floor In The Right Level. To Check To See If You Do Need To Do This , Pull You A String Along The Bottom Side Of The Joist And Just See If You Have Any Low Spots
  Reply With Quote
 
     


Question Tools Search this Question
Search this Question:

Advanced Search
Display Modes

 
Similar Sponsors

Similar Questions
Question Asker Topic Answers Last Post
rent raise homeimprv Real Estate Law 5 May 25, 2007 06:55 AM
Raise rent? dmoyers68 Real Estate Law 1 Apr 30, 2007 06:44 PM
Six Ways To Spend A Raise? posheak Finance 3 Nov 11, 2006 08:49 AM
Raise the flange???? wilks Plumbing 1 Aug 2, 2005 06:58 AM
Can I raise my tub? Alwayslost Plumbing 1 Jul 30, 2005 04:25 AM