| you want to put the rebar in about every 8 to 10"(at least), and drill them in as far as the drill bit, at least 8". You want to extend the rebar the legnth of the pour. Epoxy them in tight and tie a few vertical rebars in there. Don't forget to paint on the milky stuff to the old concrete before you pour, that stuff really does make a difference. |