    How cold is too cold to pour concrete?
    Had a contractor pour concrete in nov. 29 to dec. 5, 2010. I see cracking, flaking, cracks through 11`` sections. He told me he poured in jan. all the time and never had a problem. I`m getting this feeling he`s lying. Can you answer this about the cold. Paul
    ma0641's Avatar
    ma0641 Posts: 15,675, Reputation: 1012
    Uber Member
     
    #2

    Jun 12, 2011, 09:05 AM
    What was the temperature during the pour? Where are you located?
    twinkiedooter's Avatar
    twinkiedooter Posts: 12,172, Reputation: 1054
    Uber Member
     
    #3

    Jun 29, 2011, 06:02 PM

    He's pulling a fast one here. He knew the day he poured it was too cold and decided to go ahead anyway hoping the pour wouldn't turn out bad.

    Tell him he's full of hot air and you want it FIXED now or you'll take his lying a$$ to court and sue him to get him to redo this.

    Any concrete contractor with any brains does NOT pour when the temp is too cold. Common sense.

    Did you pressure him to pour that day or did he decide on his own to make this mess for you? If you pressured him he should have said no, let's wait till it's a bit warmer to do the pour. If he just poured it when it was way too cold out you've got him by the shorts.

    My late husband worked in concrete for years and would have never poured in weather that was too cold or rain or snowed that same day.

    Did it snow or rain the day it was poured? That just added to the problem you are now experiencing. Concrete contractors watch the weather like a hawk and do not pour when too cold or will snow or rain later in the day. Too much moisture from snow or rain will definitely ruin a good pour a few hours after concrete was poured not letting it cure or set up properly.
    twinkiedooter's Avatar
    twinkiedooter Posts: 12,172, Reputation: 1054
    Uber Member
     
    #4

    Jun 29, 2011, 06:12 PM

    Also, if it was that late in the season for pouring, did he COVER up the pour against the cold, rain or snow or did he leave it uncovered? That also can play a big part in concrete flaking, cracking as well when poured in cold weather.

Not your question? Ask your question View similar questions

 

Question Tools Search this Question
Search this Question:

Advanced Search

Add your answer here.


Check out some similar questions!

Accidentally cut through cold water pipe running through concrete slab [ 6 Answers ]

I had a bloke core drill a hole through 200mm suspended concrete slab on body corporate space outside our bathroom. We intend to put a sewrage pipe out our wall and through the slab. He hit a cold water pipe going through. Luckily it was for our flat, not our neighbours. Turned off our mains....

Concrete pour in cold weather [ 2 Answers ]

Can concrete, for footings and a slab, be successfully poured, without using additives or other weather control techniques, on any day(s) during this interval? WsId Date TmaxF TminF TmeanF PrcpIn SnowIn CDD HDD GDD 18975 12/1/2009 50 28 39 0.26 N 0 26 0 18975 12/2/2009 52 28 40 0 N ...

Concrete cold joints [ 1 Answers ]

The method of rectify concrete cold joints


View more questions Search