Ask Experts Questions for FREE Help !
Ask

accounting trouble.

Asked Jun 11, 2012, 02:14 PM — 3 Answers
A cost analyst for Stamper Manufacturing Co. has assembled the following data about the Model 24 stamp pad:

The piece of sheet metal from which five pad cases can be made costs $0.24.
This amount is based on the number of sheets in a 4,200-pound bundle of sheet metal, which is the usual purchase quantity.
The foam pad that is put in the case costs $0.06, based on the number of pads that can be cut from a large roll of foam.
Production standards, based on engineering analysis recognizing attainable performance, provide for the manufacture of 1,000 pads by two workers in an eight-hour shift. The standard direct labor pay rate is $15 per hour.
Manufacturing overhead is applied to units produced using a predetermined overhead application rate of $16 per direct labor hour, of which $6 per hour is fixed manufacturing overhead.

Required:
(a)
Calculate the standard absorption cost of a package of 10 stamp pads. (Do not round your intermediate calculations. Round final answer to 2 decimal places.)

Standard absorption cost per package: ?

(b)
Stamper Manufacturing Co.'s management is considering a special promotion that would result in increased sales of 500 packages of 10 pads per package. Calculate the cost per package that is relevant for this analysis. (Do not round your intermediate calculations. Round final answer to 2 decimal places.)

Relevant cost per package: ?

3 Answers
paraclete's Avatar
paraclete Posts: 1,879, Reputation: 585
Ultra Member
 
#2

Jun 11, 2012, 02:34 PM
Quote:
Originally Posted by needygirl View Post
A cost analyst for Stamper Manufacturing Co. has assembled the following data about the Model 24 stamp pad:

The piece of sheet metal from which five pad cases can be made costs $0.24.
This amount is based on the number of sheets in a 4,200-pound bundle of sheet metal, which is the usual purchase quantity.
The foam pad that is put in the case costs $0.06, based on the number of pads that can be cut from a large roll of foam.
Production standards, based on engineering analysis recognizing attainable performance, provide for the manufacture of 1,000 pads by two workers in an eight-hour shift. The standard direct labor pay rate is $15 per hour.
Manufacturing overhead is applied to units produced using a predetermined overhead application rate of $16 per direct labor hour, of which $6 per hour is fixed manufacturing overhead.

Required:
(a)
Calculate the standard absorption cost of a package of 10 stamp pads. (Do not round your intermediate calculations. Round final answer to 2 decimal places.)

Standard absorption cost per package: ?

(b)
Stamper Manufacturing Co.'s management is considering a special promotion that would result in increased sales of 500 packages of 10 pads per package. Calculate the cost per package that is relevant for this analysis. (Do not round your intermediate calculations. Round final answer to 2 decimal places.)

Relevant cost per package: ?
so standard cost and marginal cost go to it
Helpful
needygirl's Avatar
needygirl Posts: 11, Reputation: 1
New Member
 
#3

Jun 12, 2012, 04:06 PM
Quote:
Originally Posted by paraclete View Post
so standard cost and marginal cost go to it
You're not even answering anything. Obviously that happens.

I have
.48
.6
2.4
and am struggling to find the overhead which I add to these numbers to get the correct answer.
Helpful
paraclete's Avatar
paraclete Posts: 1,879, Reputation: 585
Ultra Member
 
#4

Jun 12, 2012, 05:01 PM
Quote:
Originally Posted by needygirl View Post
You're not even answering anything. Obviously that happens.

I have
.48
.6
2.4
and am struggling to find the overhead which I add to these numbers to get the correct answer.
It would be much easier to address your issues if you provided your workings. I have no idea what your raw numbers refer to. I see my role as discussing principle with you, I do not and will not provide sample answers. I don't have time to work through problems in detail and in any case you need to do it because it is the way you learn. You can calculate the allocated overhead in the same way you calculate direct labour cost. You have been given certain data wrapped up in a narrative which may or may not be relevant. You must extract and intrepret the relevant data. It actually takes more time searching the net for an answer than it does to answer the problem

I calculate the standard unit cost to be $0.604 you can find the package cost yourself

Most of the costs are what are called variable costs. For additional volume pricing may be based on marginal cost

Marginal cost is the cost of producing one more unit .following the course of action suggested may result in considerable excess inventory and we are not given sufficient information to calculate that outcome
Helpful

Not your question? Ask your question View similar questions

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search

Add your answer here.

Remove Text Formatting

Undo
Redo
 
Decrease Size
Increase Size
Bold
Italic
Underline
Align Left
Align Center
Align Right
Ordered List
Unordered List
Decrease Indent
Increase Indent
Insert Email Link
Wrap [QUOTE] tags around selected text
Wrap [CODE] tags around selected text
Wrap [HTML] tags around selected text
Wrap [PHP] tags around selected text
Wrap [YOUTUBE] tags around selected text
Notification Type:



Check out some similar questions!

Girlfriend trouble and sex trouble... [ 29 Answers ]

Okay so I fell in love with this girl back in last september and now it is April. I found out in December she is still talking to her ex who is in jail, they can somehow talk through the phone, I didn't know that was possible. Anyways, I love having sex with her up until recently. I either bust too...

Accounting- Having trouble with net present value (NPV) assignment [ 1 Answers ]

This is an extra credit assignment I was assigned that I really need the points for. I am having alot of trouble with it. I did a few of the questions but im not sure if they are right or not and I dont know how to do a few. Here is my work, below is the actual assignment: For number 1...

Just started accounting and having trouble journalizing. [ 1 Answers ]

3/2--Rental $3,500; $1,500 was paid in cash and $2,000 will be paid on 3/10. I'm confused on what to do. It appears that cash decreases and rent expense increases. So do I Debit Rent Expense $3500 and Credit Cash or Accounts Payable $3500?(not sure how to journal the cash and accts payable...

Have trouble sleeping - can wake up 8 times in the night.... What's the trouble [ 2 Answers ]

I have trouble with my sleep. Have passed many test, like sleep apnea and do not have sleep apnea. If not that, what's wrong with me?


View more Accounting questions Search