Not your question?
Ask your question
View similar questions
Add your answer here.Check out some similar questions!
Dialing in a footing to to build a wall to close in an existing attached garage
[ 1 Answers ]
I'm in nc an inspector called me and told me to dial in a footing where I'm going to build a wall. I might drill about 8 two foot long rods into the existing 18' long footing then lay two #5 continuous rods tied to the rebars. Put some visqueen down. Here in oxford nc carolina they want the footing...
Pouring a concrete wall in front of a damaged cinder block wall
[ 1 Answers ]
I need to repair a well house that has buckling cinder block walls. The well is below ground with a shed above it. The room is approximately 9' x 8' and 8' tall with cinder block walls and a concrete floor. The block did not have concrete poured in it when it was built, the blocks are beginning...
How to use rebar in a block wall
[ 4 Answers ]
:confused: I've read all the answers on How to build a cinder block wall using re-bar and concrete. My question is: How is the re-bar set in the footing to secure it and keep it standing straight up. Is the concrete put into the footing, a cinder block put down onto the wet concrete and then the...
ICF architecture, specifically rebar schedule and wall openings
[ 7 Answers ]
I don't know how possible this answer will be to get. I have an ICF home design made for us by an architect. I have the complete blueprints. BUT I don't see anywhere that he spells out the rebar schedule so we'd know where to place the rebar in our walls. This is my 1st time working with... View more questions Search
|